Wire it before the plaster
Before the marble goes down, the network goes in. We plan it with the electrical, to your drawings.
Bring us in at design stage.
Your architect drew every wall. Nobody drew the signal. A network planned alongside the electrical and plumbing avoids chases cut after the plaster, visible trunking, and the dead spots an owner lives with for years. Designed in early, it disappears into the house.
What we need from you.
Drawings
Floor plans, elevations and the reflected ceiling plan.
Services and programme
The services schedule and the build timeline.
The client’s intent
What they want from smart-home, AV and cameras.
How we work with you.
A design-stage walk-through, a cabling and containment plan drawn to your drawings, and coordination with your other trades. We handle first and second fix on your programme and hand over a documented system — the House Book — that the owner keeps. We work to your timeline, not ours.
It protects your finished work.
No retrofits scarring the finished house, no trunking across a feature wall. The network stays invisible, like the wiring behind the plaster. The home you designed is the home the owner lives in.
Talk at design stage.
This applies to new estates and major refurbishments alike, and to commercial fit-outs. The best time to plan it is before the first fix.
Questions, answered.
At what stage should you be involved?
Ideally at design, before first fix. The earlier we are in, the cleaner the result.
Do you work to our drawings and programme?
Yes. We plan to your drawings and build to your timeline, not ours.
What do you need from us to start?
Floor plans, elevations, the services schedule, the programme, and the client’s intent for smart-home, AV and cameras.
Do you handle only cabling, or the whole system?
We can plan the cabling and deliver the whole network, cameras and smart-home backbone. Scoped per project.
Do you work on commercial fit-outs too?
Yes. The same applies to corporate floors and building fit-outs.